Iowa life has been traditionally (and, perhaps, accurately) portrayed in movies as relaxed, serene, idyllic. However, there are still instances when time is of the essence and laid back is the furthest thing from one’s mind.
Road construction season is one of those times — an ongoing expansion of Interstate 380 (I-380) near Iowa City, Iowa, bears witness to that. There, Streb Construction is heading up work on one of three separate road segments, efforts that, when complete, will add capacity, improve safety and extend the service life of the road. Staring down a tight completion date and dealing with rains that are welcome to area farmers but a major hindrance to construction efforts, the company is utilizing 3D paving solutions that have allowed them to maintain impressive production rates while meeting stringent Iowa DOT specs. Things have gone so well, in fact, that (at the risk of overtaxing the “Field of Dreams” reference), a road contractor asking, “Is this heaven?” might be answered with, “No, this is Iowa City.”