Scheduler tab
Navigate to Schedule > Scheduler.

Tasks
Add a new task by going to Schedule > Add task. Create tasks from groups by going to Schedule > Create tasks from groups.
- The new task appears in the Scheduler panel row.
- Tasks or subtasks can also be added or deleted by right-clicking on the Scheduler result row.

Modify a task's name, choose the model group, determine the cost, or define a transition by selecting the item from the row.
The Transition mode includes:
- Add highlight
- Add
- Remove
- Temporary
- Repair
- Remove temporary
- Redesigned
- None

Task timeline
In the Edit task timeline dialog box, the task start and end dates are customizable by double clicking the selected task. Blue timelines are shown on the bottom right.
The blue taskbar duration can be edited by dragging the bar on the timeline or lengthening it from the beginning or from the end.

Scheduler cost tab
Open the Schedule cost graph from the bottom tab.
- The graph helps to visualize costs and emissions.
- You can view cumulative or current information about cost.
