Topcon ROI Calculators
This form requires javascript enabled.
Topcon 3D-MC & 3D-MC
2
Roadwork ROI Calculator:
1. = Production Payback
2. = Material Payback
3. = Staking Payback
4. = Total Payback
Other ROI Calculators:
3D-MC & 3D-MC
2
Roadwork ROI
3D-MC & 3D-MC
2
Sitework ROI
2D-3D Excavator ROI
Click here for unit conversion tools and calculators.
= Enter information
= Calculated or fixed values
= Calculation totals
Units of measurement:
US / Imperial
Metric
Load default
US / Imperial
values
1. Production Payback
Manual
3D-MC
3D-MC
2
Daily crew linear production (
ft.
):
Number of passes to get to grade:
Number of passes reduced with 3D-MC:
3D-MC
2
percentage increase in speed:
%
Crew cost per day:
Crew cost per
mile
:
Increase in productivity:
Production savings per
mile
:
2. Material Payback
Width of road (
ft.
):
With 3D-MC, thickness of material saved (
ft.
):
Cost per
ton
:
Material weight (
lb/cu. ft.
):
Material savings per
mile
:
3. Staking Payback
Grade Staking
Blue Tops
Budget for Grade Staking:
Number of surveyors:
Rate per hour:
Distance staked per 8 hour day (
ft.
):
Number of lifts requiring grade staking:
Cost for grade stakes per
mile
:
With 3D-MC, grade stakes reduced by:
%
Savings in grade staking costs:
Budget for Blue Tops:
Number of surveyors:
Rate per hour:
Distance blue topped per 8 hour day (
ft.
):
Number of lifts requiring blue tops:
Cost for blue tops per
mile
:
With 3D-MC, blue tops reduced by:
%
Savings in blue toppings costs:
Total staking savings per
mile
:
4. Total Payback
3D-MC
3D-MC
2
Production:
Material:
Staking:
Savings per
mile
:
MC system cost:
Payback in
miles
:
Additional Payouts: Rideability & Early Completion Bonuses