Topcon ROI Calculators

Topcon 3D-MC & 3D-MC2 Roadwork ROI Calculator:
1. = Production Payback
2. = Material Payback
3. = Staking Payback
4. = Total Payback
Other ROI Calculators:
3D-MC & 3D-MC2 Roadwork ROI
3D-MC & 3D-MC2 Sitework ROI
2D-3D Excavator ROI
 
Click here for unit conversion tools and calculators.

= Enter information
= Calculated or fixed values
= Calculation totals
Units of measurement:
1. Production Payback
 
Roadwork Production
 
 Manual3D-MC3D-MC2
Daily crew linear production (ft.):
Number of passes to get to grade:
Number of passes reduced with 3D-MC:    
3D-MC2 percentage increase in speed:     %
Crew cost per day:    
Crew cost per mile:
 
Increase in productivity:  
Production savings per mile:  
 

2. Material Payback
 
Roadwork Material
 
Width of road (ft.):
With 3D-MC, thickness of material saved (ft.):
Cost per ton:
Material weight (lb/cu. ft.):
Material savings per mile:
 

3. Staking Payback
 
Grade StakingRoadwork Staking
Roadwork Grade Staking
Blue Tops
Roadwork Grade Staking
Budget for Grade Staking:
Number of surveyors:
Rate per hour:
Distance staked per 8 hour day (ft.):
Number of lifts requiring grade staking:
Cost for grade stakes per mile:
With 3D-MC, grade stakes reduced by: %
Savings in grade staking costs:
 
Budget for Blue Tops:
Number of surveyors:
Rate per hour:
Distance blue topped per 8 hour day (ft.):
Number of lifts requiring blue tops:
Cost for blue tops per mile:
With 3D-MC, blue tops reduced by: %
Savings in blue toppings costs:
 
Total staking savings per mile:
 

4. Total Payback
 
 3D-MC3D-MC2
Production:
Material:
Staking:
 
Savings per mile:
MC system cost:
 
Payback in miles:
 
Additional Payouts: Rideability & Early Completion Bonuses